Don't Wait Until It's Too Late to Plan for an Emergency
A public water company used pre-emergency planning to minimize its downtime after a flood. When it became apparent there was a high probability its facilities would be flooded, the company arranged for repair crews to be on call and replacement parts to be stored in a nearby safe area. After the flood waters subsided, restoration work began immediately, while other companies were scrambling.
Full Story

College Learns Lesson About Poor Equipment Maintenance
Two new 50-ton reciprocating compressors were installed for about six months when they broke down. A pinhole in one of the evaporator tubes had allowed water into the FreonÒ system. The rest of the cooling equipment was more than 20 years old with no record of maintenance. There were no written maintenance procedures and no training records.

Full Story

Poor Lighting, Sloppy Storage Result in Chiller Breakdown
Since air conditioning was extremely important to its business, a large department store had frequent scheduled maintenance performed on its equipment. A contractor spent a week completely tearing down the chiller to perform testing and preventive work.  Then the unit completely seized up just 45 minutes after restarting.
Full Story

What Do You Expect from an Infrared Survey?
Infrared thermography is an effective tool to help avoid electrical breakdown claims.  But it’s not enough to say you want to have your electrical system surveyed, and then do it. You need a plan that presents not only your end results, but also how you expect to get there.
Full Story

Don't Let Equipment Be the Cause of Slips, Trips and Falls
When Hartford Steam Boiler inspectors visit client locations, they may find conditions that could cause employees or customers to slip, trip or fall. Here are some of the common hazards that HSB’s risk control professionals encounter in the workplace. Prevent these conditions and you can help control the risk of injury and loss.

Full Story

Experienced Personnel Should Maintain Your Fire
Protection System

A new transformer is not immune to problems. In fact, it has a higher potential for problems due to design flaws or manufacturing quality control. New equipment monitoring including a routine oil-sampling program is critical for early fault detection and the operating life of a transformer.
Full Story

Even New Transformers Need Oil and Gas Testing
A new transformer is not immune to problems. In fact, it has a higher potential for problems due to design flaws or manufacturing quality control. New equipment monitoring including a routine oil-sampling program is critical for early fault detection and the operating life of a transformer.
Full Story

Transformer Loss Shows Need for Review
A large transformer failed under full load conditions. The cause of the fault was overheating several days before. A review of the incident revealed an unlikely chain of events during the startup. Here are some recommendations that may help avoid similar losses.
Full Story

The Proper Use and Maintenance of Water Softeners
Hartford Steam Boiler investigates many claims in which scale build-up leads to leaks in boiler tubes. In one incident, the insured blamed a water treatment company for faulty treatment. But a review found that the insured had altered the feedwater train through the softeners.
Full Story

There's No Such Thing as "Maintenance-Free"
If you have an interest in keeping a machine operational for an extended period of time, then maintenance is not the place to cut corners. When you're looking at equipment from a life-cycle perspective, there is no such thing as "maintenance-free."
Full Story

Preventative Maintenance Could Have Saved Thousands
Comprehensive Electrical Preventive Maintenance (EPM) is an essential part of a facility’s overall maintenance program. EPM must be routinely performed to ensure electrical equipment is operating properly and within manufacturer’s guidelines in order to provide safe, reliable, and efficient operation.
Full Story

Don't Tolerate Poor Repair Service
The breakdown of a university's steam turbine generator highlights an important lesson. If you don't agree with the recommendations of the repair firm or OEM, get a second opinion. Technologies on repairs continue to change. Only after you believe you have exhausted all viable avenues of repair, should long-lead replacements be considered.
Full Story

A Simple Timer Can Prevent Short Cycling in Cooling Systems
A leading cause of loss in air conditioning and refrigeration is compressor failure. The cause of many such failures is short cycling, meaning that the compressor is called back into operation after having been stopped for only a brief period of time. The least costly way to help prevent this problem is to install a delay timer in the compressor starting circuit.
Full Story

Good Maintenance Includes Written Procedures and Records
The loss of two new compressors at a community college can help teach an important lesson. Don’t forget to check the entire system when replacing individual pieces of equipment, and keep written maintenance records to make the task easier.

Full Story

The Human Factor in Equipment Failures
Outside factors can defeat any system. That's why pre-planning and appropriate action by operations personnel are important. Serious damage resulted in the fire suppression system of a 27-story office building because of a lack of communications and a slow response.

Full Story

Warning: Disabling That Alarm Can Be Costly
Warning devices are an important feature of any type of equipment or system. Correct procedures must be followed to ensure that alarms and back-up systems are operating properly and not disabled or circumvented when performing maintenance or repairs..

Full Story

It Won’t Work If You Forget To Plug It In
The following claim shows that even state-of-the-art equipment is of little use unless basic steps are taken to make sure the system is operating properly.

Full Story

Fuel Savings Wiped Out By Costly Boiler Repairs
Hartford Steam Boiler paid $60,000 to repair a boiler at a school when efforts to lower fuel costs led to equipment failure. Installed in 1958, the boiler provided many years of trouble-free service. Problems began when additions and renovations were completed in the mid-1980s. Frequent tube leaks had to be re-welded. Eventually the lower tube sheet of the firetube scotch marine (FTSM) hot water heating boiler had to be replaced.
Full Story

When Failure Analysis of Broken Parts is Not Enough
Hartford Steam Boiler paid $600,000 as part of steam turbine claim because the inspections and investigative work after a failure did not find all of the broken parts. In this particular incident, the last blade stage of the low-pressure turbine encountered a water induction incident as a result of a high condenser hotwell level. The turbine blades were fastened by tie wires and some of the blades and tie wires were damaged during the incident.
Full Story

Use Extra Care When Plugging Boiler Tubes
Incomplete Boiler Repairs Can Drain Profits Plugging rather than replacing tubes is common practice when repairing commercial and industrial boilers. But a recent claim paid by Hartford Steam Boiler points out the importance of making sure all water is drained between the plugs.
Full Story