Several hot spots were found during an annual
thermography survey. Each of the hot spots was identified as
potentially resulting in subsequent damage to adjoining
components, which could shut down 25 percent of the building,
including at least one elevator. By making the repairs during
the evening hours when the building was nearly empty, there
was no service interruption and minimal repair cost. Had the
repairs not been completed after hours, it was very likely an
entire work day would have been needed to complete the
repairs.
|
|